4+ Bedrooms, 3 Bathrooms, Square Feet: 2,605
See how we customize our plans to save you money and give you just the home you want.
Breeden Homes
Getting our steps at the proper elevation. Foundation crew is scheduled for Thursday. We might be ready Wednesday?
Breeden Homes
Footings are done. Next is to strip the forms and start setting the panels for the stem walls.
Breeden Homes
Step 2 is to do some interior backfilling and then pour some interior footings. Hopefully we can get back on forming the footings tomorrow and pour on Friday.
Breeden Homes
Setting up the interior footings and they will be inspected this afternoon. Ted is starting the rain drain plumbing.
Breeden Homes
Side yard in progress. Starting tomorrow we should kick it into high gear. The dry weather will allow us to move out quite a bit of material.
Breeden Homes
Main floor framing is complete. Plumber is doing some work today. Heating guys tomorrow.
Breeden Homes
So I am a bit behind on the posting of photos. Since we last left off we have had underfloor inspections of the mechanical, plumbing, gas line and framing. Then we had the underfloor insulated and everything decked.
Breeden Homes
The first floor walls are almost all up. Possibly by the end of today and certainly by the end of tomorrow.
Breeden Homes
Crew is jumping down to wrap up some work in the garage before the concrete slab is poured.
Breeden Homes
Just have the front garage header to frame and install. Garage slab is still scheduled for Monday.
Load More